A465 Widening: Dukestown Cemetery

Client

Carillion Civil Engineering

Location

Tredegar

Value

£150,000

As part of the major A465 Heads of the Valleys dualling scheme, double corrosion protection anchors were required to tie back a 1200mm diameter contiguous pile retaining wall. Anchors installed at 20 degree declination through a cast in-situ parapet into highly fractured and abrasive quartzitic sandstone.

Our solution involved:

  • Design: Installation of three¬†sacrificial test anchors. Full investigation testing in accordance with BS EN 1537:2013.
  • Double Corrosion Protection Anchors: Installation of 50 Dywidag DCP anchors in 100mm bore using our Comacchio MC600 drilling rig and 115mm diameter casing system.
  • Pre-Stressing: Combined Acceptance Test and permanent locking off/pre-stressing in accordance with BS EN 1537:2013.